Larger development
Part of a larger development
Project imagery
No project-specific rendering has been independently verified yet. The original filing and reporting are linked below; we will add an architectural image when its connection to this exact proposal is confirmed.
Renderings, plans & views
Project location
Nearby projects
Find other developments in this part of Houston.

Under construction · 17-story office tower · ~266K SF office
14 stories · 340 apartments

Final planning · 460 apartments + 93 hotel suites
230-apartment Midtown development with five residential levels
What we know
The former Battelstein department store at 812 Main Street is being converted into the Studio Tower, expanding the adjacent JW Marriott Downtown in the historic Carter Building. The ten-story adaptive-reuse project adds 56 guest rooms and approximately 10,000 square feet of event space, plus a rooftop restaurant, bar and pool. The hotel expansion brings the property to 384 rooms. The Foundry opened in November 2026. Chron reported on November 26th that reservations for the new rooms are open, while The Perch is scheduled to open December 1st; the rooftop opening remains upcoming. Exterior context: The conversion reuses the ten-story limestone-clad Battelstein’s building beside the taller Carter Building hotel. City review records identify window and storefront alteration work. The gallery pairs a dated March 2019 pre-conversion photograph with Marriott’s undated exterior views; a dated finished-façade photograph has not yet been verified.
Development timeline
Buildings & phases
Mixed-use developments often include multiple buildings with different heights, uses and completion dates.
Design evolution
Compare how the documented project program has been presented over time. Earlier plans, marketing figures and later construction details are not necessarily evidence of a facade redesign.