Larger development
Part of a larger development
Project imagery
No project-specific rendering has been independently verified yet. The original filing and reporting are linked below; we will add an architectural image when its connection to this exact proposal is confirmed.
Renderings, plans & views
Project location
Nearby projects
Find other developments in this part of Houston.

Covered athletics practice facility

Campus gateway / public space / athletics
24-story mixed-use tower · filed, no confirmed design rendering

Topped out · 15-story condominium tower
What we know
The stadium component of Rice's Gateway Project replaces the west press box and upper concourse with a three-level building for club seating, 14 suites, media and operations. Other planned work includes a shade canopy, removal of much of the east upper deck, a continuous concourse and new concession/restroom buildings. The three-story figure applies to the proposed west concourse building. The stadium project is separate from the Kraft practice pavilion; a pavilion start does not establish stadium demolition or construction.
Development timeline
Buildings & phases
Mixed-use developments often include multiple buildings with different heights, uses and completion dates.
Design evolution
Compare how the documented project program has been presented over time. Earlier plans, marketing figures and later construction details are not necessarily evidence of a facade redesign.