Under construction · 17-story office tower · ~266K SF office
New restaurant and boutique village at The RO · late 2027 target

28-story, 317-apartment tower under construction at The RO

Under construction · 17-acre district · phased deliveries
What we know
The 40-story, approximately 533-foot 2929 Weslayan was originally developed by PM Realty Group and the INDURE Fund, designed by RTKL Associates and built by CF Jordan. It broke ground November 2012 and was completed in 2015. Original plans included 254 rental apartments, approximately 12,000 square feet of ground-floor retail and a garage. Sade Real Estate acquired the tower in 2026 and renamed it The Arno. Ownership reporting describes 168 units, differing from the original 254-unit design; the reason for this discrepancy is unverified. A separate $11 million 2026 improvement filing preceded the November 19, 2026 announcement that Raffles Hotels & Resorts and Sade plan to convert the existing building into 114 branded condominium residences plus a Grande Villa. Sales are targeted for early 2027, with a projected 2028 opening. The conversion has been announced, not completed; this is NOT a newly built tower. A November 2026 Sade Real Estate investor presentation describes a redesigned architectural crown at level 40, renewed entrance lobby and shared amenity spaces, and a substantially reconfigured interior. The proposal includes a seventh/eighth-floor pool terrace, wellness and dining spaces, and penthouse and villa residences on upper floors. The same presentation reports that early strip-out has begun in vacated apartments and communal areas, including work on the eighth-floor pool terrace, while full-building vacating and renovation remain phased. The October 2026 illustrations are conceptual and subject to change. The developer forecasts full-building vacancy in April 2027 and buyer handovers during 2028–2029; those are forecasts rather than confirmed completion dates.
Development timeline
Buildings & phases
Mixed-use developments often include multiple buildings with different heights, uses and completion dates.
Design evolution
Compare how the documented project program has been presented over time. Earlier plans, marketing figures and later construction details are not necessarily evidence of a facade redesign.